Completed electrical design for the installation of an ASU (Air Separation Unit) from the incoming power supply to the individual end users. Plot plans were redone on scale suitable for power and instrumentation drawings. Cable tray layouts were done for all instrumentation, control and 480V power cables. Conduit and cable schedules for all plant cables, including cooling tower and control building. Elementary and schematic diagrams were done for all motors, lube oil pumps and lube oil heaters. Preparation of contractor bid package and copying of vendor drawings were also done.

Capital Costs: $10,000,000