Four (4) belt conveyors and two (2) apron conveyors to surge feed raw material into a furnace. Included two (2) new bins and the rework of two (2) existing bins.
Capital Costs: $800,000
20
APR
APR
0
Four (4) belt conveyors and two (2) apron conveyors to surge feed raw material into a furnace. Included two (2) new bins and the rework of two (2) existing bins.
Capital Costs: $800,000