Performed engineering design of a spinning system, staple system and baler system. The above listed equipment was inventoried in a Tennessee plant and relocated to a Georgia plant. The equipment was decommissioned, disconnected, crated, transported and reinstalled per the design drawing. The creel, cans and Trio equipment systems were new and were integrated into the bi-component system. The control systems for spinning, staple and baler were upgraded to Allen Bradley PLC control. New HMI’s were supplied with the control systems. A 22’x 27’x 53’ penthouse was extended above the existing warehouse roofline (21’). The penthouse was erected to house the baler equipment.
Capital Costs: $12,800,000