Bi-Component Fiber System

Performed engineering design of a spinning system, staple system and baler system.  The above listed equipment was inventoried in a Tennessee plant and relocated to a Georgia plant.  The equipment was decommissioned, disconnected, crated, transported and reinstalled per the design drawing.  The creel, cans and Trio equipment systems were new and were integrated into the bi-component system.  The control systems for spinning, staple and baler were upgraded to Allen Bradley PLC control.  New HMI’s were supplied with the control systems.  A 22’x 27’x 53’ penthouse was extended above the existing warehouse roofline (21’).  The penthouse was erected to house the baler equipment.

Capital Costs:  $12,800,000