Basic design and procurement for two (2) belt conveyors conveying chemical fertilizer. Also added a non-corrodible enclosure over an existing open storage bin for the product.
Capital Costs: $350,000
APR
Basic design and procurement for two (2) belt conveyors conveying chemical fertilizer. Also added a non-corrodible enclosure over an existing open storage bin for the product.
Capital Costs: $350,000
Development of P&ID’s, final estimate, detailed engineering and design for Civil/Structural, Mechincal, Electrical and Instrumentation.
Capital Costs: $21,000,000
Preliminary and detailed design for new spray dryer system and ancilliary equipment.
Capital Costs: $17,000,000
Debottlenecking of refrigerant process plant. Preliminary and final estimate; detailed engineering design including process simulation, review of existing equipment and specification for replacement and purchase of new equipment, evaluation of process structure for equipment loads, process and utility piping design and electrical and instrumentation.
Capital Costs: $3,500,000
Preliminary design and budget development for new 300,000 API-650 storage tank and containment.
Capital Costs: $3,500,000
Preliminary and detailed design for refrigerant plant debottlenecking project.
Capital Costs: $5,000,000
Many snall debottlenecking projects of pump and tank additions/replacements, exchangers, columns, etc.
Capital Costs: <$1,000,000
75mm extruder system.
Capital Costs: $8,500,000
Resin unloading system.
Capital Costs: $3,000,000
Commercial centrifuge system.
Capital Costs: $4,000,000