Fuel Blending Control System

Engineering and design for the installation of a PLC-controlled fuel blending control system including programming and screen configuration.

Capital Costs: $375,000

Instrument Air

Design, engineering and construction supervision to install new instrument/service compressed air system.

Capital Costs: $1,000,000

Sand Delivery System

A sand delivery system that starts out with pneumatic conveyors moving foundry sand to a storage hopper in the top of the structure. After the sand descends through the structure it is heated and mixed with rosins. From the mixer the mixed batch was transported along a traveling hopper to dump into one of six (6) sand molding machines.

Capital Costs: $500,000

Boilerhouse

Layout, design and oversee construction for 5,300 square foot boilerhouse expansion for the installation of a 206,000 lbs./hr., gas-fired B & W steam boiler.

Capital Costs: $11,600,000

Piping System

Installation of a piping system and tank to supply softened water.

Capital Costs: $150,000

Air Separation Unit

Completed electrical design for the installation of an ASU (Air Separation Unit) from the incoming power supply to the individual end users. Plot plans were redone on scale suitable for power and instrumentation drawings. Cable tray layouts were done for all instrumentation, control and 480V power cables. Conduit and cable schedules for all plant cables, including cooling tower and control building. Elementary and schematic diagrams were done for all motors, lube oil pumps and lube oil heaters. Preparation of contractor ...

Wood Chip Handling Conveyors

Two (2) wood chip handling conveyors. Unique structural designs utilizing curved trusses and supports that had to circumvent a number of different obstacles.

Capital Costs: $500,000

Wood Fines Conveying and Storage

Pneumatic conveyors, surge hopper, screener, vibrating conveyor, and pulverized process for handling wood fines for engineered wood structural panels.

Capital Costs: 750,000

Plant Expansion

Complete plant expansion, primary, secondary, finishing, blending, barge loadout, automation and startup. Western Kentucky.

Capital Cost: $45,000,000