Consolidation of Manufacturing

Performed preliminary engineering design to consolidate four warehousing/manufacturing sites into a single site.  Assistance was provided to the client to provide a time study flow chart.  A lean operations review was completed for the process from raw material receipt through finished goods truck loading.

Capital Costs:  $3,200,000

0

Add a Comment