Provide engineering, design and drafting to provide an improved management system at a Plastics facility to contain storm water contaminated with polyethylene powder and pellets. Then segregate the powder and pellets from the effluent prior to discharging offsite. These modifications shall add two (2) new points of powder/pellet segregation before the water reaches a sump. This shall also provide a means to trap powder and pellets at the storm water out falls and ditches before exiting the site.
Capital Costs: $1,000,000
9
DEC
DEC
0